Projects
| Fort Leonard Wood : Replace Fascia on Buildings in 1700 Area |
| Fort Leonard Wood : Install Window A/C Units in Rolling Pin Barracks |
| Fort Sill : Restation ADA School, Center Level Renovations, Building 700 |
| MCRC Terre Haute : Preventative Maintenance and Control Inspection |
| NASA Michoud Assembly Facility : Building 206 Tank Painting |
| NASA Michoud Assembly Facility : Building 103 Lab/Mezzanine Renovation |
| NASA Michoud Assembly Facility : Building 485 Repairs |
| NASA Michoud Assembly Facility : Interior Finish Renovation, Building 220 |
| NASA Michoud Assembly Facility : Building 351 Interior Renovations |
| NASA Michoud Assembly Facility : Building 130 Interior Renovations |
| NASA Michoud Assembly Facility : Renovation of Building 320A |
| NASA Michoud Assembly Facility : Building 404 Phase II |
| NASA Michoud Assembly Facility : Building 350 Phase II |
| NASA Michoud Assembly Facility : Daycare Facility Demolition, Building 358 |
| NASA Michoud Assembly Facility : Building 420 Interior Repair, Phase II |
| National Park Service : Rim Rock Trial Steps and Deck Replacement |
| NOS Louisville : Replace Elevator, “W” Building |
| NRC Louisville KY : Automatic Sprinklers & Fire Alarm System Upgrade |
| NSA Crane : Emergency Generator Repair |
| NSA Crane : Tent City Communications |
| NSA Crane : Intrusion Detection System |
| NSA Crane : Install Paint Booth, Building 155 |
| NSA Crane : Installation of Wood Frame Canopies in Residential Area |
| NSA Crane : Renovation of Comptroller Spaces, Building 64 |
| NSA Crane : Prep and Paint Building 101 |
| NSA Crane : Renovate Restrooms & Office, Building 101 |
| NSA Crane : Office Furniture in Building 56 |
| NSA Crane : Zone 9 – Repair/Improve Access Roads |
| NSA Crane : Construct Metal Enclosure with Roof for APE 1236 Furnace at Bldg 3343 |
| NSA Crane : NAPEC Hasp Installation on Various Magazine Doors |
| NSA Crane : High Speed Deluge System & Twin Screw Extruder |
| NSA Crane : B-41 Humidify Sustainment Area |
| NSA Crane : Construct Lab Room 114, Building 41 |
| NSA Crane : Provide Quality Control Services to Joint Ordnance and Engineering Logistics Facility |
| NSA Crane : Crane DNR Office and Additional Remodeling on Various Buildings |
| NSA Crane : Install Fiber Optics Backbone, Automated Gates and Fencing |
| NSA Crane : Provide Quality Control Services to Building 41 |
| NSA Crane : Modify Secure Area, Building 2 |
| NSA Crane : Building 126 – High Speed Deluge System |
| NSA Crane : Tower 3291 Window and Insulation Installation |
| NSA Crane : Minefill B Compressors, Buildings 3396 & 3397 |
| NSA Crane : Fire Protection Systems, Buildings 102 & 160 |
| NSA Crane : Renovate Building 34, Phase I Part I |
| U.S. Army Corps of Engineers : Performance Oriented Construction Activity |
| U.S. Coast Guard : Replace Windows at USCG Station Kenosha |
| VA Hospital, Marion IN : Construct Canteen |
-
-
Contacts
Mary Luttrell
(812) 244-0625
-
Jerry Richardson
(812) 384-8610
-
Address
1218 Wabash Avenue
Terre Haute, IN 47807
-
Policies
Company documents available upon request:
- Safety Program
- Hazard Communications Plan
- Affirmative Action/EEO Policy
- Substance Abuse Policy
- Sexual Harassment Policy
Copyright © 2011 MLE Enterprises, Inc. • All Rights Reserved